Phase 2 - Winter 2003-4

Construction will focus on the indoor portion of the layout.  In this segment, benchwork and the minimum trackage needed to operate this segment will be constructed and wired.  A substantial amount of work will be required the indoor train room.  As a result it is likely that little more than benchwork and main tracks will be installed and operational in this phase.  This trackage will model the following portions of the NPC line.

bulletSausalito Docks - These are the docks from which NPC steamers arrived from and departed to San Francisco.  This segment is a significant switching facility terminating in a single track to the Sauselito yard and maintenance facility.  These docks will be executed as closely to the prototype as possible using this drawing and photos obtained from a variety of sources.

 
bulletSausalito Yard & Shops - This was the home base of the North Pacific Coast.  The shops were state of the art for the time.  The NPC built two of its engines at this facility.  From the shops, the main line will extend north to the staging area for the outdoor portion of the layout and run through the wall outdoors to the portion of the layout constructed in Phase 1.  This portion will be modeled as closely to the prototype as possible using this drawing and a number of photos of shop structures.
 
bulletSausalito to Mill Valley Junction - this is the indoor portion of the main line exiting the Shops.  It loops around then drops down a ramp to the staging area and exits to the outside of the layout.

The following drawing is the proposed plan for the portion of the layout inside the shed.  Main lines are in dark gray.  Dotted dark gray lines run under the benchwork surface and allow for continuous loop running.  They also provide an interchange with the outside portion of the layout by running through the wall in the lower left corner of the drawing.

Light gray lines are yard and switching trackage.  Major structures are identified.  

 