San Anselmo Yards

Prototype Track Plan

 

The image at the top of the page is the prototype track plan for San Anselmo for 1900.  The photo to the left from 1898 does not show all the structures on the plan.

NPC Garden RR Track Plan

 

To the left is a horizontally reversed image of the San Anselmo track plan, the way in which it will be modeled.  Beginning with the line coming from San Francisco at the bottom of the image, the branch to San Rafael will exit to to the left through a tunnel under the staircase.  The branch to Cazadero, shown exiting to the right, will loop back left and pass through the lower tunnel in the staircase.  San Anselmo Creek will begin to the left of the track from San Francisco and will cross over to the right.  From there it will follow the main line toward Cazadero as it does in this reversed image.   Structures shown on the track plan will be modeled as well as sidings and the wye.  Not all structures are shown in the above 1898 photo.

This photo shows the general area in which San Anselmo will be constructed.  The main line from Sausalito will enter from the bottom of the photo. The branch line to San Rafael will curve left and pass through the upper tunnel under the staircase in the middle of the photo.  Meanwhile the main line to Cazadero will turn right then loop left, passing through the lower tunnel near the middle right edge of the photo.  The San Anselmo yards will be located just above the lower tunnel, ending near the staircase.

Construction

The yard trackage will be laid concurrently with the Trackage 1 project.  Structures were very limited in San Anselmo in the period being modeled and will focus primarily on railroad structures.  The structures will be built in the winter of 2007-8 for installation in the Spring of 2008.