Construction
Home ] Up ] Research ] Standards ] Railroad Site ] [ Construction ]

 

Infrastructure
San Rafael

North Pacific Coast Garden Railroad

Railroad Construction

This will be a large garden railroad.  Yet I want to have trains running by fall of 2007.  So the layout will be built in phases over a period of 2-3 years.  Here's what has been scheduled so far.  Pages and links will be added as projects go live.

bulletSummer of 2007 - Exterior Infrastructure - See the Infrastructure link for details.
bulletFall of 2007 - Sausalito Tunnel to San Rafael - See the San Rafael link for details.
bulletWinter of 2007 - Interior Infrastructure - See the Family Room link for details:
bulletWinter of 2007 - Sausalito - See the Sausalito link for details.

The construction area will document construction methods and decisions that have been made.  Each construction area is likely to be made up of multiple pages as there are many individual projects within each phase.

(c) 2007 Iron Horse 1:29